![]() |
OFFICE
OF THE COMMISSIONER OF CUSTOMS, |
C2/9/2001-AP(PORT)
CUSTOM HOUSE, CHENNAI-1. (S.SANKARAVADIVELU)
DATED: 12.12.2001 DY.
COMMR. OF CUSTOMS (APPG.)
Notification No. 112/ 2001-Customs
In exercise of the powers conferred by sub-section (1) of section 25 of the
Customs Act, 1962 (52 of 1962), the Central Government, being satisfied that it
is necessary in the public interest so to do, hereby makes the following further
amendment in the notification of the Government of India in the Ministry of
Finance (Department of Revenue), No. 17/2001-Customs, dated the 1st March,
2001, namely:-
In
the said notification, -
(a) in the Table, after S. No. 250 and the
entries relating thereto, the following shall be inserted, namely:-
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
|
"250A. |
84
or any other Chapter |
Goods specified in List 19A required in connection
with coal bed methane operations undertaken under specified contracts under
the Coal Bed Methane Policy |
Nil |
Nil |
52"; |
(b) in the Annexure, in Condition no.
52, -
(i) in sub-condition (a), for the words beginning
with "petroleum operations" and ending with the words "First
Schedule", the following shall be substituted, namely,-
"petroleum operations or coal bed methane
operations, as the case may be, to be undertaken under a contract signed with
the Government of India, on or after the 1st day of April 1998, under the New
Exploration Licensing Policy, or on or after the 1st day of April 2001 in terms
of the Coal Bed Methane Policy, as the case may be;"
(ii) in sub-conditions (b) and (c);
(a) for the
words "petroleum operations" wherever they occur, the words
"petroleum operations or coal bed methane operations, as the case may
be" shall be substituted
(b)
(b) for the words "New Exploration Licensing
Policy" wherever they occur, the words "New Exploration Licensing
Policy or Coal Bed Methane Policy, as the case may be" shall be
substituted ;
(c) after
List 19 and the entries relating thereto the following shall be inserted,
namely:-
"List 19A (See S.
No. 250 A of the Table)
(1) Land Seismic Survey Equipment and accessories, seismic survey vesels, global positioninig system and accessories, and other materials required for seismic work or other types of Geophysiacl and Geochemical surveys for on-shore activities
(2)
All types of Driling rigs, shot-hole drilling rigs. Mobile
rigs, workover rigs consisting of various equipment and other drilling
equipment required for drilling operations, snubbing units, hydraulic workover
units, self-elevating workover platforms
(3) All types
of Equipments / units for specialized services like, cementing, logging, casing
repair, Production testing, simulation and mud services, reservoir engineering,
geological equipment, directional drilling, Stimulation, Coil Tubing units,
drill stem testing (DST), data acquisition and processing, solids control,
fishing (as related to downhole retrieval in coal bed methane operations), well
control, blowout prevention (BOP), pipe inspection including Non Destructive Testing,
curing, gravel pack, well completion and workover for SBM wells including
wireline and downhole equipment
(4) All types
of casing pipes, drill pipes, production tubing, pup joints, connections,
coupling, Kelly, cross overs and swages, Drive Pipes
(5) All types
of drilling bits, including nozzles, breakers and related tolls
(6) All types
of coal bed methane chemicals including synthetic products used in coal bed
methane operations, required for drilling, production and transportations of
gas
(7) Process,
production and well installation for CBM and water injection including items
forming part of the installation and equipment required like process equipment,
turbines, pumps, generators, compressors, primemovers, water makers, filters
and filtering equipment, Telemetery, Telecommunication, Tele- Control and other
material required for installations
(8) Line pipes
for flow lines and trunk pipelines including weight-coating and wrapping
(9) Tanks used
for storage of coal bed methane water, mud, chemicals and related materials
(10) All types
of fully equipped units/equipment required for pollution control, fire
prevention, fire fighting, safety items like fire and gas detection equipment,
including H2 S monitoring equipment
(11) Mobile and
skid mounted pipe laying, pipe testing and pipe inspection equipment
(12) All types
of valves including high pressure valves
(13) Communication
equipment required for operations including synthesized VHF Aero and VHF multi
channel sets (17) Non-directional radio beacons, intrinsically safe
walkie-talkies, directional finders, EPIRV, electronic individual security
devices including electronic access control system
(14) Specialized
antenna system, simplex telex over radio terminals, channel micro wave systems,
test and measurement equipment
(15) Area
surveillance system
(16) Common
depth point (CDP) cable, logging cable, connectors, geo-phone strings,
perforation equipment and explosives
(17) Wellhead
and Christmas trees, including valves, chokes, heads spools, hangers and
actuators, flexible connections like chicksons and high pressure hoses, shut
down panels (22) Cathodic Protection Systems including anodes
(18) Technical
drawings, maps literature, Data tapes, Operational and Maintenance Manuals
required for coal bed methane operations
(19) Sub-assemblies,
tools, accessories, stores, spares, materials, supplies, consumables for
running, repairing or maintenance of the goods specified in this List
Note:- The principal notification was published in
the Gazette of India, Extraordinary, vide notification No. 17/2001-Customs,
dated the 1st March, 2001 [G.S.R.116 (E), dated the 1st March, 2001] and was
last amended by notification No. 111/2001-Customs, dated the 31st October, 2001
[G.S.R. 810 (E), dated the 31st October, 2001].
**********************